Supplementary Report - EIS - Other documents

Coordinator-General’s report on project changes
Download IAS - Figure 2 Coordinator-General's report on project changes
Download IAS - Figure 2 Further Information to Application for Project Change

Application for Project Change
Download IAS - Figure 2 Project Change Report

Supplementary Report Volume Descriptions
Volume 1: addresses the relevant matters raised in submissions to the EIS and identifies the key issues, the predicted environmental impacts and recommended mitigation measures for the project without local connections.

Appendix A – Submission Summary and Response Reference:
A table of all the matters raised in the submissions on the EIS with a cross-reference to where each matter is addressed in the Supplementary Report. 

Appendix B – Response to Submissions:
Contains a summary of the issues raised in submissions to the EIS and specific responses to these issues. Also includes corrections and clarification of the EIS.

Appendix C – Community Consultation Report:
Describes the process and outcomes of consultation conducted during the public notification period for the Northern Link EIS, from Monday 27 October 2008 to Monday 22 December 2008.

Appendix D – Environmental Management Plan:
The Draft Outline Environmental Management Plan (EMP) establishes the environmental objectives and performance criteria identified for the Northern Link Project for both the design and construction phase and also the operation and maintenance phase of the project.  Outline mitigation measures are also included based on the environmental assessment as undertaken within both the EIS and the Supplementary Report for each of the design and construction and operation and maintenance phases of the project.

Appendix E – Supplementary Technical Papers:
Technical reports dealing with some aspects of the supplementary report investigations.

Volume 2 – Project Design: Detailed engineering drawings to assist in understanding the complexity of the project design (without local connections).

Volume 1 - Supplementary Report
Download IAS - Figure 2 Supplementary Report
    Appendices
Download IAS - Figure 2 Appendix A - Submission Analysis
Download Initial Advice Statement Appendix B - Response to Submissions
Download Initial Advice Statement Appendix C - Community Consultation Report
Download Initial Advice Statement Appendix D - Environmental Management Plan
Download Initial Advice Statement Appendix E - Supplementary Technical Papers
 
Volume 2
    Drawing Index
Download Initial Advice Statement Drawing Index
    Planning Layouts
Download IAS - Figure 2 Planning Layouts - Key Sheets Layout
Download IAS - Figure 2 1. Planning Layouts - (Plan 1 of 10)
Download IAS - Figure 2 2. Planning Layouts - (Plan 2 of 10)
Download IAS - Figure 2 3. Planning Layouts - (Plan 3 of 10)
Download IAS - Figure 2 4. Planning Layouts - (Plan 4 of 10)
Download IAS - Figure 2 5. Planning Layouts - (Plan 5 of 10)
Download IAS - Figure 2 6. Planning Layouts - (Plan 6 of 10)
Download IAS - Figure 2 7. Planning Layouts - (Plan 7 of 10)
Download IAS - Figure 2 8. Planning Layouts - (Plan 8 of 10)
Download IAS - Figure 2 9. Planning Layouts - (Plan 9 of 10)
Download IAS - Figure 2 10. Planning Layouts - (Plan 10 of 10)
   
  Typical Cross Sections
Download IAS - Figure 2 1. Typical Cross Sections - Two Lane Tunnel Boring Machine (TBM)
Download IAS - Figure 2 2. Typical Cross Sections - Two Lane Tunnel Boring Machine (TBM) Cross Passage
Download IAS - Figure 2 3. Typical Cross Sections - Two Lane Tunnel Boring Machine (TBM) Cross Passage Section
Download IAS - Figure 2 4. Typical Cross Sections - Two Lane and Cover Tunnel with Ventilation Tunnel
   
  Longitudinal Sections
Download IAS - Figure 2 1. Longitudinal Sections - Northern Link Tunnel Eastbound - (Sheet 1 of 2)
Download IAS - Figure 2 2. Longitudinal Sections - Northern Link Tunnel Eastbound - (Sheet 2 of 2)
Download IAS - Figure 2 3. Longitudinal Sections - Northern Link Tunnel Westbound - (Sheet 1 of 2)
Download IAS - Figure 2 4. Longitudinal Sections - Northern Link Tunnel Westbound - (Sheet 2of 2)
   
  Construction Site Plans
Download IAS - Figure 2 Proposed Construction Sites - Key Sheets Layout
Download IAS - Figure 2

1. Indicative Western Freeway Construction Site

Download IAS - Figure 2 2. Proposed Western Freeway Connection - Indicative Conveyor Location
   
  Traffic Management and Staging
Download IAS - Figure 2 Traffic Management and Staging - Key Sheets Layout
Download IAS - Figure 2 1. Traffic Management and Staging - Western Freeway Connection - (Plan 1 of 4)
Download IAS - Figure 2 2. Traffic Management and Staging - Western Freeway Connection - (Plan 2 of 4)
Download IAS - Figure 2 3. Traffic Management and Staging - Western Freeway Connection - (Plan 3 of 4)
Download IAS - Figure 2 4. Traffic Management and Staging - Western Freeway Connection - (Plan 4 of 4)
Download IAS - Figure 2 5. Traffic Management and Staging - Inner City Bypass Connection - (Plan 1 of 4)
Download IAS - Figure 2 6. Traffic Management and Staging - Inner City Bypass Connection - (Plan 2 of 4)
Download IAS - Figure 2 7. Traffic Management and Staging - Inner City Bypass Connection - (Plan 3 of 4)
Download IAS - Figure 2 8. Traffic Management and Staging - Inner City Bypass Connection - (Plan 4 of 4)
   
  Ventilation Systems
Download IAS - Figure 2 Ventilation Plan - Key Sheets Layout
Download IAS - Figure 2 Proposed Ventilation Sites - Western Freeway Connection - (Plan 1 of 2)
Download IAS - Figure 2 Proposed Ventilation Sites - Inner City Bypass Connection - (Plan 2 of 2)
   
  Estimated Tunnel Settlement Contours
Download IAS - Figure 2 Estimated Tunnel Settlement Contours - Key Sheet Layout
Download IAS - Figure 2 1. Estimated Tunnel Settlement Contours - (Plan 1 of 6)
Download IAS - Figure 2 2. Estimated Tunnel Settlement Contours - (Plan 2 of 6)
Download IAS - Figure 2 3. Estimated Tunnel Settlement Contours - (Plan 3 of 6)
Download IAS - Figure 2 4. Estimated Tunnel Settlement Contours - (Plan 4 of 6)
Download IAS - Figure 2 5. Estimated Tunnel Settlement Contours - (Plan 5 of 6)
Download IAS - Figure 2 6. Estimated Tunnel Settlement Contours - (Plan 6 of 6)

 

EIS volume descriptions
Volume 1: The EIS identifies the key issues, the predicted environmental impacts and recommended mitigation measures.

Volume 2: Detailed engineering drawings to assist in understanding the complexity of the reference design.

Volume 3: Technical reports dealing with the biophysical and socio-economic aspects of the environment.

In Brief:  Provides a broad overview of the Northern Link EIS, including the existing environment and the predicted project impacts. It also provides a summary of the conclusions reached and the recommendations put forward to the Coordinator-General. To gain further understanding of the project, the In Brief should be read in conjunction with the EIS.


EIS Documents
Download IAS - Figure 2 1. Northern Link EIS - In Brief
Volume 1
    Part A
Download IAS - Figure 2 1. Introduction
Download Initial Advice Statement 2. Project Rationale
Download Initial Advice Statement 3. Project Development
Download Initial Advice Statement 4. Project Description
Download Initial Advice Statement 5. Traffic and Transport
Download Initial Advice Statement 6. Geology and Soils
Download Initial Advice Statement 7. Hydrology
    Part B
Download Initial Advice Statement 8. Air Quality
Download Initial Advice Statement 9. Noise and Vibration
Download Initial Advice Statement 10. Ecology
Download Initial Advice Statement 11. Planning and Land use
Download IAS - Figure 2 12. Cultural heritage
Download IAS - Figure 2 13. Social Environment
Download IAS - Figure 2 14. Urban Design and Visual Environment
    Part C
Download IAS - Figure 2 15. Economic Environment
Download IAS - Figure 2 16. Hazard and Risk
Download IAS - Figure 2 17. Waste Management
Download IAS - Figure 2 18. Health and Safety
Download IAS - Figure 2 19. Draft Outline Environmental Management Plan
Download IAS - Figure 2 20. Urban Regeneration
Download IAS - Figure 2 21. Cumulative Impacts
Download IAS - Figure 2 22. Conclusion and Recommendations
   
Download IAS - Figure 2 References
Download IAS - Figure 2 Glossary to Terms
Download IAS - Figure 2 Study Team
   
  Appendix
Download IAS - Figure 2 Appendix A - Terms of Reference/ EIS Guideline in Response to ToR
Download IAS - Figure 2 Appendix B - Community Consultation Report

 

Volume 2 EIS Reference Project
    Drawing Index
Download IAS - Figure 2 1. Drawing Index
    Planning Layouts
Download IAS - Figure 2 Planning Layouts - Key Sheets layout
Download IAS - Figure 2 1. Planning Layouts - (Plan 1 of 11)
Download IAS - Figure 2 2. Planning Layouts - (Plan 2 of 11)
Download IAS - Figure 2 3. Planning Layouts - (Plan 3 of 11)
Download IAS - Figure 2 4. Planning Layouts - (Plan 4 of 11)
Download IAS - Figure 2 5. Planning Layouts - (Plan 5 of 11)
Download IAS - Figure 2 6. Planning Layouts - (Plan 6 of 11)
Download IAS - Figure 2 7. Planning Layouts - (Plan 7 of 11)
Download IAS - Figure 2 8. Planning Layouts - (Plan 8 of 11)
Download IAS - Figure 2 9. Planning Layouts - (Plan 9 of 11)
Download IAS - Figure 2 10. Planning Layouts - (Plan 10 of 11)
Download IAS - Figure 2 11. Planning Layouts - (Plan 11 of 11)
    Typical Cross Section
Download IAS - Figure 2 1. Typical Cross Section - One Lane Road Header Tunnel with Longitudinal Passage
Download IAS - Figure 2 2. Typical Cross Section - Two Lane Tunnel Boring Machine (TBM)
Download IAS - Figure 2 3. Typical Cross Section - Two Lane Road Header Tunnel with Longitudinal Passage
Download IAS - Figure 2 4. Typical Cross Section - Three Lane Road Header Tunnel with Longitudinal Passage
Download IAS - Figure 2 5. Typical Cross Section - Three Lane Road Header Tunnel at Y - Junction
Download IAS - Figure 2 6. Typical Cross Section - Two Lane Tunnel Boring Machine (TBM) Cross Passage
Download IAS - Figure 2 7. Typical Cross Section - Road Header Cross Passage
Download IAS - Figure 2 8. Typical Cross Section - Cross Passage
Download IAS - Figure 2 9. Typical Cross Section -Structures
    Longitudinal Sections
Download IAS - Figure 2 1. Longitudinal Sections - Northern Link Tunnel Eastbound - (Sheet 1 of 2)
Download IAS - Figure 2 2. Longitudinal Sections - Northern Link Tunnel Eastbound - (Sheet 2 of 2)
Download IAS - Figure 2 3. Longitudinal Sections - Northern Link Tunnel Westbound - (Sheet 1 of 2)
Download IAS - Figure 2 4. Longitudinal Sections - Northern Link Tunnel Eastbound - (Sheet 2 of 2)
Download IAS - Figure 2 5. Longitudinal Sections - Northern Link Tunnel Eastbound Entry Ramp
Download IAS - Figure 2 6. Longitudinal Sections - Northern Link Tunnel Westbound Exit Ramp
Download IAS - Figure 2 7. Longitudinal Sections - Northern Link Tunnel Eastbound Exit Ramp
Download IAS - Figure 2 8. Longitudinal Sections - Northern Link Tunnel Westbound Entry Ramp
Download IAS - Figure 2 9. Longitudinal Sections - Northern Link Eastbound Entry Ramp Elevated Structures
    Construction Site Plan
Download IAS - Figure 2 Proposed Construction Sites - Key Sheets Layout
Download IAS - Figure 2 1. Proposed Western Freeway Construction Site - (Plan 1 of 4)
Download IAS - Figure 2 2. Proposed Toowong Construction Site - (Plan 2 of 4)
Download IAS - Figure 2 3. Proposed Kelvin Grove Construction Plan - (Plan 3 of 4)
Download IAS - Figure 2 4. Proposed Western Freeway Conveyor Location - (Plan 4 of 4)
    Traffic Management and Staging
Download IAS - Figure 2 Traffic Management and Staging - Key Sheets Layout
Download IAS - Figure 2 1. Traffic Management and Staging - Western Freeway Connections - (Plan 1 of 4)
Download IAS - Figure 2 2. Traffic Management and Staging - Western Freeway Connections - (Plan 2 of 4)
Download IAS - Figure 2 3. Traffic Management and Staging - Western Freeway Connections - (Plan 3 of 4)
Download IAS - Figure 2 4. Traffic Management and Staging - Western Freeway Connections - (Plan 4 of 4)
Download IAS - Figure 2 5. Traffic Management and Staging - Toowong Connection - (Plan 1 of 3)
Download IAS - Figure 2 6. Traffic Management and Staging - Toowong Connection - (Plan 2 of 3)
Download IAS - Figure 2 7. Traffic Management and Staging - Toowong Connection - (Plan 3 of 3)
Download IAS - Figure 2 8. Traffic Management and Staging - Kelvin Grove Connection - (Plan 1 of 3)
Download IAS - Figure 2 9. Traffic Management and Staging - Kelvin Grove Connection - (Plan 2 of 3)
Download IAS - Figure 2 10. Traffic Management and Staging - Kelvin Grove Connection - (Plan 3 of 3)
Download IAS - Figure 2 11. Traffic Management and Staging - Inner City Bypass Connection - (Plan 1 of 4)
Download IAS - Figure 2 12. Traffic Management and Staging - Inner City Bypass Connection - (Plan 2 of 4)
Download IAS - Figure 2 13. Traffic Management and Staging - Inner City Bypass Connection - (Plan 3 of 4)
Download IAS - Figure 2 14. Traffic Management and Staging - Inner City Bypass Connection - (Plan 4 of 4)
    Ventilation Plans
Download IAS - Figure 2 Ventilation Plan - Key Sheets Layout
Download IAS - Figure 2 1. Proposed Ventilations Sites - Western Freeway Connections - (Plan 1 of 2)
Download IAS - Figure 2 2. Proposed Ventilations Sites - Inner City BypassConnections - (Plan 2 of 2)
    Estimated Tunnel Settlement Contours
Download IAS - Figure 2 Estimated Tunnel Settlement Contours - Key Sheet Layout
Download IAS - Figure 2 1. Estimated Tunnel Settlement Contours - (Plan 1 of 7)
Download IAS - Figure 2 2. Estimated Tunnel Settlement Contours - (Plan 2 of 7)
Download IAS - Figure 2 3. Estimated Tunnel Settlement Contours - (Plan 3 of 7)
Download IAS - Figure 2 4. Estimated Tunnel Settlement Contours - (Plan 4 of 7)
Download IAS - Figure 2 5. Estimated Tunnel Settlement Contours - (Plan 5 of 7)
Download IAS - Figure 2 6. Estimated Tunnel Settlement Contours - (Plan 6 of 7)
Download IAS - Figure 2 7. Estimated Tunnel Settlement Contours - (Plan 7 of 7)

 

Volume 3 - Technical papers
Download IAS - Figure 2 1. Traffic and Transport
Download IAS - Figure 2 2. Geology and Soils
Download IAS - Figure 2 3. Contaminated land
Download IAS - Figure 2 4. Groundwater
Download IAS - Figure 2 5. Surface Water
Download IAS - Figure 2 6. Flooding
Download IAS - Figure 2 7. Air Quality (Operation)
Download IAS - Figure 2 7a. Air Quality (Construction)
Download IAS - Figure 2 7b. Air Quality (Greenhouse Gases)
Download IAS - Figure 2 8. Air Quality (Health)
Download IAS - Figure 2 9a. Noise and Vibration (Construction)
Download IAS - Figure 2 9b. Noise and Vibration (Operation)
Download IAS - Figure 2 10. Ecology
Download IAS - Figure 2 11. Planning and Land Use
Download IAS - Figure 2 12. Cultural Heritage
Download IAS - Figure 2 13. Social Environment
Download IAS - Figure 2 14. Urban design
Download IAS - Figure 2 15. Economics

Other EIS Documents

Download Initial Advice Statement Initial Advice Statement (898kb pdf)
Download IAS - Figure 1 IAS - Figure 1 (77kb pdf)
Download IAS - Figure 2 IAS - Figure 2 (1,62Mb pdf)
Download IAS - Figure 3 IAS - Figure 3 (1,62Mb pdf)
Download TransApex prefeasibility report TransApex prefeasibilty report
Download TransApex prefeasibility report Terms of Reference
Download TransApex prefeasibility report Terms of Reference – Figure 1

 

 
SKM and Connell Wagner Joint Venture Font Size Small font size Medium font size Large font size